The key documentary statement
On June 17, 2025, construction superintendent Ryan Craft emailed building official Scott Safe a description he attributed to the owner's abatement contractor. The description identifies Building A, Unit 109 among locations where "mold clean-up and sealing" were represented as completed.
The transmitted general process lists HEPA vacuuming, application of a mold disinfectant, wiping the surface, and an antimicrobial coating if needed. The email does not include a separate Unit 109 work log, before-and-after photographs, an independent clearance report, or test results proving exactly which steps occurred in that apartment.